SMITH KLINE & BEECHAM - 2007 INSTALL

When one of the world’s leaders in pharmaceuticals was experiencing problems with a storm line, US Sewer was called to solve the problem. After a new phase of construction had just been completed on a new 100,000 square foot building, someone at the Smith Kline facility realized there was a problem. The 30 inch diameter storm line that ran directly underneath of the building was in very bad shape. The 40 year old, corrugated steel pipe looked like a piece of Swiss cheese on the inside. There was little to know structural integrity left of the pipe. Working through the night US Sewer & Drain installed an 800 foot long by 30 inch diameter pipe liner in the old metal pipe. The pipe has been completely rehabilitated and Smith Kline Beecham has had no further problems with the pipe to date.