HERSHEY PARK
![]()
When one of the countries largest amusement parks and chocolate factories was having structural problems with their storm system, Hershey Park contacted US Sewer & Drain to take care of the problem. The 24 inch diameter concrete pipe ran through the center of the amusement park. Excavating this 500 foot pipe would have been a night mare for park. US Sewer & Drain was able to install a 500 foot length of 13mm thick cured-in-place pipe liner from a manhole located in a back staging area of the park. Unbeknowst to the thousands of patrons that day, a pipe liner sit curing out fifteen feet below them. With no disruption to the parks daily routine Hershey Park now has a new section of storm line which will last for over fifty years.
|
||||